McClure Design & Build Contractors - Doing all Concrete Labor work for a 380,000 sq. ft High School
Friday, November 19, 2010
G Building Interior Footings
Layout of G Building Interior Footings as well as the instalaltion fo these footings has begun. We have ran into an issue with the plumber installing his pipes too shallow at column footing locations, that is being addressed and corrected.
No comments:
Post a Comment