The work over the last two weeks have been very productive. Along with the placement of the Cast in Place Columns the perimeter footing package for building K has been completed. The footings at the west end of K had some trouble being installed because of water seeping from the sand pile for Building J. The sitre has had problems with the soli conditions around us but luckily we have had very little incidents with the overall footing placement. Also the Cast in Place Walls for M building are being placed as well. Vapor Barrier for G Building and M Building are also being done today.